Day rates by role
| Role | International rangeNOK per day | Norwegian guidelineNOK per 7.5 h shoot day |
|---|---|---|
| Stunt performerStuntman, stuntwoman or double | 6 000–10 000 | 6 500 |
| Stunt riggerTechnical rigging and safety | 7 000–11 000 | 8 000 |
| Stunt coordinatorPlanning, leadership and safety | 9 000–14 000 | 8 500 |
| Fight choreographerChoreography and direction of fight sequences | 8 000–13 000 | Not listed |
| Assistant stunt coordinatorSupports the coordinator in prep and on the shoot | 7 000–11 000 | Not listed |
| Action designerCamera-focused action design, priced on scope | Quoted per project | Not listed |
International ranges are built from SAG-AFTRA daily minimums converted to NOK and market rates in the UK, Germany and Scandinavia. They are a starting point for negotiation, not a ceiling. The Norwegian column shows Norsk filmforbund's guideline rates from 1 June 2023, which exclude social costs. Battleblade quotes international rates.
What else is billed
- Half-day rate
- Costume fittings and jobs under four hours, short recce visits, and rehearsal sessions outside shoot days.
- Travel and accommodation
- Reimbursed or provided by the production. Prep and recce days are billed separately, usually at around half the day rate.
- Stunt adjustments
- Higher-risk stunts, such as hard hits, high falls, fire and car work, are paid an adjustment on top of the day rate. It is set per stunt and agreed before the stunt is performed.
- VAT
- All rates exclude VAT. VAT is added only where it applies.
The Norwegian guidelines in detail
The stunt group in Norsk filmforbund, the Norwegian film workers' union, publishes shared guideline rates for stunt work in Norway. Beyond the shoot-day rates in the table, the guidelines cover these days and extra payments:
Other days
- Rehearsal or choreography day
- Half-day rate
- Costume or make-up beforehand
- Half-day rate
- Travel with equipment
- Full stunt day rate
- Travel without equipment
- Half-day rate
- Waiting day
- Half-day rate
Stunt adjustments
Hard hits and falls, high falls, fire burns, car hits and car crashes are paid a stunt adjustment: extra pay on top of the day rate for that specific stunt. Norsk filmforbund calls it risikotillegg or belastningstillegg. The stunt coordinator assesses and sets it, based on protection, costume, landing surface, general safety on location and the number of takes.
Overtime
Follows Norsk filmforbund's overtime rates.
The guideline rates exclude social costs. For invoiced work, Norsk filmforbund adds 26% for social costs. Source: Norsk filmforbund, stunt guideline rates, 1 June 2023. filmforbundet.no
View the original table from Norsk filmforbund
Common cost questions
Are there official stunt rates in Norway?
Yes, as guidelines. The stunt group in Norsk filmforbund publishes shared guideline rates per 7.5-hour shoot day (June 2023): 6,500 NOK for a stunt performer, 8,000 NOK for a stunt rigger and 8,500 NOK for a stunt coordinator. Social costs and VAT come on top. Battleblade quotes international rates, shown in the table above.
How much does a stuntman cost in Norway?
Norsk filmforbund's guideline rate for a stunt performer is 6,500 NOK per 7.5-hour shoot day (June 2023). Rehearsal days, costume fittings and waiting days are paid at the half-day rate, and harder stunts are paid a stunt adjustment, set by the stunt coordinator. Social costs and VAT come on top.
How much does a fight choreographer cost?
Norsk filmforbund has no separate rate for a fight choreographer. Internationally, a fight choreographer usually costs 8,000 to 13,000 NOK per day (table above), and choreography and rehearsal days are often billed at half the day rate. On smaller productions a single scene is often quoted per project.
Is it expensive to make an action scene?
Not necessarily. The biggest cost driver is unplanned shoot time. A well-planned fight scene with one choreographer can fit an indie budget, and the earlier the planning starts, the cheaper the scene gets.
What does a single fight scene cost?
There is no fixed price, because a fight scene is priced from the days it takes, not the scene itself. A short exchange between two people can be choreographed and shot inside one day. A longer sequence with several performers, weapons or falls needs rehearsal days on top. At Norsk filmforbund's guideline rates, each stunt performer costs 6,500 NOK per shoot day, with rehearsal days at the half-day rate.
What does a stunt coordinator cost?
Norsk filmforbund's guideline rate is 8,500 NOK per 7.5-hour shoot day (June 2023), with social costs and VAT on top. Scene breakdowns and prep before the shoot day are not included. A coordinator is responsible for safety, team assembly and planning, and is usually needed once a production has several performers or higher-risk action.
What makes stunt work more or less expensive?
Shoot days, number of performers, rehearsal time and risk. Under Norsk filmforbund's guidelines, hard hits, high falls, fire burns and car work are paid a stunt adjustment on top of the day rate, set by the stunt coordinator, and overtime follows the union's overtime rates. Equipment such as rigging or pads adds cost, and so does deciding the action on the day instead of planning it in pre-production.